JeHN Engineering Portfolio - Resdiential
JeHN Engineering Portfolio - Commercial
JeHN Engineering Portfolio - Survey
JeHN Engineering Portfolio - Construction Mgmt.
JeHN Engineering Portfolio - Stormwater Mgmt.
JeHN Engineering Portfolio - Roadways
JeHN Engineering Portfolio - Entitlement
JeHN Engineering Portfolio - Municipal
JeHN Engineering Portfolio - Special District
JeHN Engineering Portfolio - Industrial
JeHN Engineering Portfolio - Sewer/Water
JeHN Engineering Portfolio - De-Watering
JeHN Engineering Portfolio - Structural
Turkey Creek Bridge Replacement

Client: Chimney Rock Metro District Project Location: Morrison, Colorado

Project Data: JeHN Engineering designed a double 8x10 box culvert for the crossing of Turkey Creek, as well as widening and replacing the roadway. Part of the design process included a bridge modeling using the Army Corp of Engineers' HEC-2 and HEC-RAS models, preparation of pre-cast box culvert plans and 1000 linear feet of Belleview Drive relocation plans. JeHN also successfully coordinated all aspects of construction, which included daily oversight and inspection of all contractors, scheduling, and documenting of all activities, including field changes. The culvert was built in two stages to maintain traffic over the bridge and water flow in the creek. The construction was conducted in accordance with the requirements of Jefferson County and the Colorado Department of Transportation, who had both allocated funds for the project.